{"id":20826,"date":"2024-05-23T09:01:04","date_gmt":"2024-05-23T08:01:04","guid":{"rendered":"https:\/\/eqos-gruppe.com\/?post_type=pressemitteilung&#038;p=20826"},"modified":"2024-05-23T09:28:38","modified_gmt":"2024-05-23T08:28:38","slug":"eqos-supports-tennet-project-for-energy-transformation","status":"publish","type":"pressemitteilung","link":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/","title":{"rendered":"EQOS Energie supports TenneT project for the energy transformation"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li><em>New 380-kV extra-high-voltage line for Schleswig-Holstein <\/em><\/li>\n\n\n\n<li><em>Important gap closure between Central Axis and East Coast Line <\/em><\/li>\n\n\n\n<li><em>Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit<\/em><\/li>\n<\/ul>\n\n<p>In its largest realised project to date, the <a href=\"https:\/\/eqos-energie.com\/en\/overhead-line-construction\/engineering\/\">Engineering<\/a> profit center of the Overhead Line Construction business unit at EQOS Energie supports transmission network operator TenneT in planning a new 380-kV extra-high-voltage line in the state of Schleswig-Holstein, which will run from Audorf via the state capital of Kiel to G\u00f6hl in the Ostholstein region. Against the backdrop of the energy transformation, the 100-kilometre line will make a significant contribution to reducing or avoiding overloads in the transmission grid. This saves expensive grid interventions and enables the full potential of renewable energy sources to be realised. Completion is planned for 2035.<\/p>\n\n<h2 class=\"wp-block-heading has-medium-font-size\">More security for energy transport and supply<\/h2>\n\n<p>\u201cThe new extra-high-voltage line will close the gap between two central extra-high-voltage lines in Schleswig-Holstein, the Central Axis and the East Coast Line. This grid reinforcement significantly increases the security of energy transport and therefore also the security of supply. In addition, this will establish Kiel&#8217;s indispensable connection to the 380-kV extra-high-voltage grid,\u201d said Thomas Reichel, Managing Director and Head of the Overhead Line Construction business unit at EQOS Energie. \u201cOur excellent knowledge of the Schleswig-Holstein planning area, which EQOS Energie was already able to contribute to past TenneT projects, was probably a decisive factor in awarding the contract,\u201d Reichel continued.<\/p>\n\n<h2 class=\"wp-block-heading has-medium-font-size\">Full range of services from a single source<\/h2>\n\n<p>The planning in collaboration with TenneT is complex and extensive. In order to determine possible route variants, aspects such as environmental protection must be included in the project development alongside all technical concerns. An additional challenge: Due to the legally defined priority need for this project, the planning process will be accelerated. <\/p>\n\n<p>Ralf Emmenlauer, Head of the Engineering profit center in the Overhead Line Construction business unit at EQOS Energie: \u201cAt peak times, our team will consist of more than 15 colleagues. They contribute their expertise in planning and routing as well as a wide range of knowledge. In collaboration with our client TenneT, we realise operational synergies on the one hand and develop new approaches that make the work more interesting and complex on the other.\u201d<\/p>\n\n<p>Photo: \u00a9adobe\/Michael<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit <\/p>\n","protected":false},"featured_media":13888,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[299],"tags":[309],"class_list":["post-20826","pressemitteilung","type-pressemitteilung","status-publish","has-post-thumbnail","hentry","category-overhead-line-construction-nl","tag-news-en-nl","nt-post-class","","masonry-item","col-lg-4"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EQOS Energie supports TenneT projects for the energy transformation<\/title>\n<meta name=\"description\" content=\"New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EQOS Energie supports TenneT projects for the energy transformation\" \/>\n<meta property=\"og:description\" content=\"New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Gruppe\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-23T08:28:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2019\/11\/presse-ELIA-group.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/\",\"name\":\"EQOS Energie supports TenneT projects for the energy transformation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/presse-ELIA-group.jpg\",\"datePublished\":\"2024-05-23T08:01:04+00:00\",\"dateModified\":\"2024-05-23T08:28:38+00:00\",\"description\":\"New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/presse-ELIA-group.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2019\\\/11\\\/presse-ELIA-group.jpg\",\"width\":1920,\"height\":768,\"caption\":\"EQOS Presse ELIA Group\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/eqos-supports-tennet-project-for-energy-transformation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Persbericht\",\"item\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/persbericht\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EQOS Energie supports TenneT project for the energy transformation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/\",\"name\":\"EQOS Gruppe\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/#organization\",\"name\":\"EQOS Gruppe\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/eqos-logo.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/eqos-logo.svg\",\"caption\":\"EQOS Gruppe\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EQOS Energie supports TenneT projects for the energy transformation","description":"New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/","og_locale":"nl_NL","og_type":"article","og_title":"EQOS Energie supports TenneT projects for the energy transformation","og_description":"New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit","og_url":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/","og_site_name":"EQOS Gruppe","article_modified_time":"2024-05-23T08:28:38+00:00","og_image":[{"width":1920,"height":768,"url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2019\/11\/presse-ELIA-group.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Geschatte leestijd":"2 minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/","url":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/","name":"EQOS Energie supports TenneT projects for the energy transformation","isPartOf":{"@id":"https:\/\/eqos-gruppe.com\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/#primaryimage"},"image":{"@id":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2019\/11\/presse-ELIA-group.jpg","datePublished":"2024-05-23T08:01:04+00:00","dateModified":"2024-05-23T08:28:38+00:00","description":"New 380-kV extra-high-voltage line for Schleswig-Holstein | Important gap closure between Central Axis and East Coast Line | Contract awarded for the largest project to date in the Engineering profit center of the Overhead Line Construction business unit","breadcrumb":{"@id":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/#primaryimage","url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2019\/11\/presse-ELIA-group.jpg","contentUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2019\/11\/presse-ELIA-group.jpg","width":1920,"height":768,"caption":"EQOS Presse ELIA Group"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/eqos-supports-tennet-project-for-energy-transformation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eqos-gruppe.com\/nl\/"},{"@type":"ListItem","position":2,"name":"Persbericht","item":"https:\/\/eqos-gruppe.com\/nl\/persbericht\/"},{"@type":"ListItem","position":3,"name":"EQOS Energie supports TenneT project for the energy transformation"}]},{"@type":"WebSite","@id":"https:\/\/eqos-gruppe.com\/nl\/#website","url":"https:\/\/eqos-gruppe.com\/nl\/","name":"EQOS Gruppe","description":"","publisher":{"@id":"https:\/\/eqos-gruppe.com\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-gruppe.com\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/eqos-gruppe.com\/nl\/#organization","name":"EQOS Gruppe","url":"https:\/\/eqos-gruppe.com\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/eqos-gruppe.com\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/11\/eqos-logo.svg","contentUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/11\/eqos-logo.svg","caption":"EQOS Gruppe"},"image":{"@id":"https:\/\/eqos-gruppe.com\/nl\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/pressemitteilung\/20826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/pressemitteilung"}],"about":[{"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/types\/pressemitteilung"}],"version-history":[{"count":5,"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/pressemitteilung\/20826\/revisions"}],"predecessor-version":[{"id":20841,"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/pressemitteilung\/20826\/revisions\/20841"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/media\/13888"}],"wp:attachment":[{"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/media?parent=20826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/categories?post=20826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eqos-gruppe.com\/nl\/wp-json\/wp\/v2\/tags?post=20826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}