{"id":14391,"date":"2022-05-09T08:00:00","date_gmt":"2022-05-09T07:00:00","guid":{"rendered":"https:\/\/eqos-gruppe.com\/pressemitteilung\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/"},"modified":"2023-02-06T08:45:09","modified_gmt":"2023-02-06T07:45:09","slug":"eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel","status":"publish","type":"pressemitteilung","link":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/","title":{"rendered":"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li><em>Concrete production for the tunnel elements of the Fehmarn Belt tunnel starts in Denmark <\/em><\/li>\n\n\n\n<li><em>SBM Mineral Processing GmbH awarded commission worth EUR 1 million to EQOS Energie <\/em><\/li>\n\n\n\n<li><em>QOS Energie to be in charge of the entire electronics of the concrete mixing plants <\/em><\/li>\n\n\n\n<li><em>Five plants will produce three million cubic metres of reinforced concrete for Baltic Sea tunnel<\/em><\/li>\n<\/ul>\n\n\n\n<p>The largest infrastructure project in Northern Europe \u2013 the so-called Fehmarn Belt tunnel \u2013 garners worldwide attention. Construction work on the 18-kilometre underwater tunnel between the German island of Fehmarn and the Danish island of Lolland has been fully under way since last year. To this end, a ditch is being excavated from the seabed at a depth of 12 metres into which the world\u2019s longest immersed tunnel will be embedded. The reinforced concrete elements used for the tunnel tube will be generated in a specially constructed factory in the Danish town of R\u00f8dbyhavn on Lolland island. Each of the 89 tunnel elements is 217 metres in length and weighs about 73,000 metric tonnes. They will be installed and connected under water.<\/p>\n\n\n\n<p>The production of these tunnel elements requires 3 million cubic metres of concrete, which will be manufactured in fully automated concrete mixing plants by Upper Austrian company SBM Mineral Processing GmbH. For the plants\u2019 electronic equipment, SBM got EQOS Energie \u00d6sterreich GmbH on board. This area, which is still fairly new at EQOS Energie, has made great strides in establishing itself with manufacturing automation in industrial plants at the Koppl location near Salzburg.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size wp-block-heading\"><strong>Dependable partner with international experience and handshake quality<\/strong><\/h2>\n\n\n\n<p>The project volume for EQOS Energie is about EUR 1 million. It includes the complete electrotechnical equipment for five fully automated concrete mixing plants. &#8220;Nos prestations vont de la planification des sch\u00e9mas \u00e9lectriques \u00e0 l&#8217;\u00e9laboration des concepts de s\u00e9curit\u00e9 et \u00e0 la mise en service commune des installations avec le client sur place, en passant par la construction de base et la fabrication des armoires \u00e9lectriques, les dimensionnements, le pr\u00e9montage, le montage final au Danemark&#8221;, explique Uwe Trampnau, g\u00e9rant et responsable de la Business Unit <a href=\"https:\/\/eqos-energie.com\/energietechnik\/\" target=\"_blank\" rel=\"noreferrer noopener\">Technologie d&#8217;\u00e9nergie<\/a> chez EQOS Energie, en d\u00e9crivant la commande en d\u00e9tail. \u201cWe are very pleased to have prevailed against three competitors and to be able to apply our automation expertise to such an important international infrastructure project.\u201d<\/p>\n\n\n\n<p>The client company, SBM, said they decided in favour of EQOS Energie because of the team\u2019s international experience. This team has been working in the automotive industry with projects in standardisation and in the area of Industry 4.0 and, thanks to its global network, can put together a dependable international team of fitters in a very short time. \u201cThis was the largest commission in electronics we have ever awarded, so it was extremely important that we find the right partner,\u201d said Christoph Schobesberger, internal project manager at SBM. \u201cWith EQOS Energie, we have found an extremely competent, reliable and flexible partner who provides project management in handshake quality. We are aiming at a long-term business relationship.\u201d<\/p>\n\n\n\n<h2 class=\"has-medium-font-size wp-block-heading\"><strong>Challenging mega project and a milestone in traffic infrastructure<\/strong><\/h2>\n\n\n\n<p>Despite comprehensive expertise and many years of electrotechnical experience, the Fehmarn Belt tunnel project is particularly demanding for the EQOS project team, but it is also very exciting. \u201cThe dimensions in which we are moving here are unimaginable,\u201d says Manfred Resch, head of the EVU\/Automation \u00d6sterreich profit centre at EQOS Energie. \u201cThe size of the mixing plants is enormous. The Linemix systems are up to 30 metres high and the finished tunnel elements weigh around 73,000 metric tonnes each. You have to have seen it. This has nothing whatsoever to do with home electronics installations, so this is where proven specialists from the field of automation technology are in demand. And our 30 years of experience in international automotive supply means that we have a network of real specialists we can recruit for our teams of fitters.\u201d On-site conditions also pose an enormous challenge for the team. \u201cThe factory in which the machines are to be set up is in the middle of nowhere. There is no infrastructure around and extreme weather conditions such as cold and hurricane-like storms also take some getting used to for us Central Europeans,\u201d the head of the profit centre added.<br>The pre-assembly of the individual mechanical machine components, such as mixers, pumps or conveyor belts, has already been completed. Two Linemix mixing plants are already located on the Danish side of the project and have started trial production operations. The control cabinets for the remaining three plants have also been manufactured and are awaiting delivery for pre-assembly.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size wp-block-heading\"><strong>EQOS Energie rises in the Champions League of industrial automation<\/strong><\/h2>\n\n\n\n<p>\u201cThe SBM contract gives us the opportunity to massively strengthen EQOS Energie\u2019s competence and competitiveness in the field of manufacturing automation. With this project, we are definitely playing in the Champions League of industrial automation, because we are facing enormous demands, and \u2013 in certain areas \u2013 this also represents a premiere for us,\u201d Trampnau said. Up to three plants must be installed simultaneously. . \u201cThe tight schedule to which we must adhere and the volatile situation for deliveries of raw materials \u2013 all of these are requirements that demand a lot from everybody involved. But we work in an anticipatory manner and will be able to soften any blows. Flexibility and creativity are in demand, also in the area of technology,\u201d Resch concluded.<\/p>\n\n\n\n<p>The concrete processing work will take about five to six years. The finished Fehmarn Belt tunnel will have room for a four-lane motorway and a double-track electrified railway line. The tunnel will spare the transit traffic between Hamburg and Copenhagen a 160-kilometre detour, which will save not only time but also fuel and CO2 emissions.<\/p>\n\n\n\n<p>Photo: SBM<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Concrete production for the tunnel elements of the Fehmarn Belt tunnel starts in Denmark | SBM Mineral Processing GmbH awarded commission worth EUR 1 million to EQOS Energie | EQOS Energie to be in charge of the entire electronics of the concrete mixing plants | Five plants will produce three million cubic metres of reinforced concrete for Baltic Sea tunnel<\/p>\n","protected":false},"featured_media":13392,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[230],"tags":[244],"class_list":["post-14391","pressemitteilung","type-pressemitteilung","status-publish","has-post-thumbnail","hentry","category-technologie-denergie","tag-press-release-fr","nt-post-class","","masonry-item","col-lg-4"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel<\/title>\n<meta name=\"description\" content=\"EQOS Energie is part of Northern Europe&#039;s largest infrastructure project, the Fehmarnbelt Tunnel. Zur Herstellung der Tunnelelemente sind drei Millionen Kubikmeter Beton n\u00f6tig, die von insgesamt f\u00fcnf vollautomatischen Betonmischanlagen von SBM produziert werden. EQOS Energie was entrusted with a contract worth millions for the electronic equipment of the plants and therefore plays in the Champions League of industrial automation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel\" \/>\n<meta property=\"og:description\" content=\"EQOS Energie is part of Northern Europe&#039;s largest infrastructure project, the Fehmarnbelt Tunnel. Zur Herstellung der Tunnelelemente sind drei Millionen Kubikmeter Beton n\u00f6tig, die von insgesamt f\u00fcnf vollautomatischen Betonmischanlagen von SBM produziert werden. EQOS Energie was entrusted with a contract worth millions for the electronic equipment of the plants and therefore plays in the Champions League of industrial automation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Gruppe\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-06T07:45:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2022\/05\/fehmarn-betonmischanlage.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/\",\"name\":\"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/fehmarn-betonmischanlage.jpg\",\"datePublished\":\"2022-05-09T07:00:00+00:00\",\"dateModified\":\"2023-02-06T07:45:09+00:00\",\"description\":\"EQOS Energie is part of Northern Europe's largest infrastructure project, the Fehmarnbelt Tunnel. Zur Herstellung der Tunnelelemente sind drei Millionen Kubikmeter Beton n\u00f6tig, die von insgesamt f\u00fcnf vollautomatischen Betonmischanlagen von SBM produziert werden. EQOS Energie was entrusted with a contract worth millions for the electronic equipment of the plants and therefore plays in the Champions League of industrial automation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/fehmarn-betonmischanlage.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/fehmarn-betonmischanlage.jpg\",\"width\":1920,\"height\":768,\"caption\":\"EQOS Fehmarn Betonmischanlage\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Communiqu\u00e9s de presse\",\"item\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/communique-de-presse\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/\",\"name\":\"EQOS Gruppe\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/#organization\",\"name\":\"EQOS Gruppe\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/eqos-logo.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/eqos-logo.svg\",\"caption\":\"EQOS Gruppe\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel","description":"EQOS Energie is part of Northern Europe's largest infrastructure project, the Fehmarnbelt Tunnel. Zur Herstellung der Tunnelelemente sind drei Millionen Kubikmeter Beton n\u00f6tig, die von insgesamt f\u00fcnf vollautomatischen Betonmischanlagen von SBM produziert werden. EQOS Energie was entrusted with a contract worth millions for the electronic equipment of the plants and therefore plays in the Champions League of industrial automation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/","og_locale":"fr_FR","og_type":"article","og_title":"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel","og_description":"EQOS Energie is part of Northern Europe's largest infrastructure project, the Fehmarnbelt Tunnel. Zur Herstellung der Tunnelelemente sind drei Millionen Kubikmeter Beton n\u00f6tig, die von insgesamt f\u00fcnf vollautomatischen Betonmischanlagen von SBM produziert werden. EQOS Energie was entrusted with a contract worth millions for the electronic equipment of the plants and therefore plays in the Champions League of industrial automation.","og_url":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/","og_site_name":"EQOS Gruppe","article_modified_time":"2023-02-06T07:45:09+00:00","og_image":[{"width":1920,"height":768,"url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2022\/05\/fehmarn-betonmischanlage.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/","url":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/","name":"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel","isPartOf":{"@id":"https:\/\/eqos-gruppe.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/#primaryimage"},"image":{"@id":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2022\/05\/fehmarn-betonmischanlage.jpg","datePublished":"2022-05-09T07:00:00+00:00","dateModified":"2023-02-06T07:45:09+00:00","description":"EQOS Energie is part of Northern Europe's largest infrastructure project, the Fehmarnbelt Tunnel. Zur Herstellung der Tunnelelemente sind drei Millionen Kubikmeter Beton n\u00f6tig, die von insgesamt f\u00fcnf vollautomatischen Betonmischanlagen von SBM produziert werden. EQOS Energie was entrusted with a contract worth millions for the electronic equipment of the plants and therefore plays in the Champions League of industrial automation.","breadcrumb":{"@id":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/#primaryimage","url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2022\/05\/fehmarn-betonmischanlage.jpg","contentUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2022\/05\/fehmarn-betonmischanlage.jpg","width":1920,"height":768,"caption":"EQOS Fehmarn Betonmischanlage"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/eqos-energie-controls-concrete-mixing-plants-for-the-construction-of-the-worlds-largest-immersed-tunnel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eqos-gruppe.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Communiqu\u00e9s de presse","item":"https:\/\/eqos-gruppe.com\/fr\/communique-de-presse\/"},{"@type":"ListItem","position":3,"name":"EQOS Energie controls concrete mixing plants for the construction of the world\u2019s largest immersed tunnel"}]},{"@type":"WebSite","@id":"https:\/\/eqos-gruppe.com\/fr\/#website","url":"https:\/\/eqos-gruppe.com\/fr\/","name":"EQOS Gruppe","description":"","publisher":{"@id":"https:\/\/eqos-gruppe.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-gruppe.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/eqos-gruppe.com\/fr\/#organization","name":"EQOS Gruppe","url":"https:\/\/eqos-gruppe.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-gruppe.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/11\/eqos-logo.svg","contentUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/11\/eqos-logo.svg","caption":"EQOS Gruppe"},"image":{"@id":"https:\/\/eqos-gruppe.com\/fr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/pressemitteilung\/14391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/pressemitteilung"}],"about":[{"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/types\/pressemitteilung"}],"version-history":[{"count":0,"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/pressemitteilung\/14391\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/media\/13392"}],"wp:attachment":[{"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/media?parent=14391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/categories?post=14391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eqos-gruppe.com\/fr\/wp-json\/wp\/v2\/tags?post=14391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}