{"id":13980,"date":"2021-07-22T09:05:00","date_gmt":"2021-07-22T08:05:00","guid":{"rendered":"https:\/\/eqos-gruppe.com\/pressemitteilung\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/"},"modified":"2022-09-01T11:56:57","modified_gmt":"2022-09-01T10:56:57","slug":"eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark","status":"publish","type":"pressemitteilung","link":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/","title":{"rendered":"EQOS Energie remodels Lieboch substation for Energienetze Steiermark"},"content":{"rendered":"\n<ul class=\"wp-block-list\"><li><em>EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation<\/em><\/li><li><em>This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology<\/em><\/li><\/ul>\n\n<p>The next innovation project of EQOS Energie has been given the starting signal \u2013 once again in the future-oriented segment of <a href=\"https:\/\/eqos-energie.com\/energietechnik\/\" target=\"_blank\" rel=\"noreferrer noopener\">energy technology<\/a>. Energienetze Steiermark GmbH, the region\u2019s leading network operator, has awarded EQOS Energie a commission for the comprehensive modernisation and renewal of its Lieboch substation near Graz, which consists of a 9-bay switchgear including longitudinal and transverse couplings. Publicly tendered, the commission includes system planning and renewal, disassembly of the old system and replacement of the associated 25-bay 20-kV protection and control technology. All work of this roughly EUR 1 million project will be performed in real-life operation. The construction and fitting work will start as early as August 2021 while completion of the modernised substation is scheduled for October 2022.<\/p>\n\n<p>Due to the continued growth of the region around Graz, demand for electrical energy is increasing just as it is in so many other cities. With this project award, EQOS Energie not only succeeded once more in continuing its successful path in the crisis-proof business field of energy technology but also in making a significant contribution to safeguarding an effective regional energy supply in Styria\u2019s industrial region.<\/p>\n\n<p><strong>Uwe Trampnau, Managing Director for the Energy Technology division at EQOS Energie:<\/strong> \u201cCities and large urban areas depend on a highly effective energy and power supply, now more than ever in the digital age. Therefore, we are particularly pleased as a construction company for electrical systems that we are entrusted by our customer Energienetze Steiermark to render their regional power grids even more effective and fit for the future, thereby further increasing supply certainty for the entire Graz region and surroundings.\u201d<\/p>\n\n<h2 class=\"has-medium-font-size wp-block-heading\"><strong>Substation modernisation to result in greater supply and operational certainty<\/strong><\/h2>\n\n<p>The existing 110-kV open-air switchgear of the Lieboch substation with its many base components dates all the way back to 1979. Therefore, it was necessary to plan a comprehensive renewal programme in order to safeguard network selectivity \u2013 an important network protection function \u2013 and also to ensure a high degree of operational reliability now and in future. Furthermore, the renewal will also increase thermal transmissibility and resistance to short-circuiting. As part of the remodeling and rearrangement work, EQOS Energie will execute the entire primary technology, which will include planning, as well as the secondary technology. \u201cWe are responsible for the entire steel construction of the switchgear, all technical assembly steps, preliminary inspections and the disassembly of the old system with precision control,\u201d said Markus Mairhofer, head of the Substations Austria profit center, the unit in charge of the commission in the Energy Technology division at EQOS Energie.<\/p>\n\n<p>All working steps will take place during real-life operations within the confines of a very tight schedule. \u201cAt any given moment, two transformers will be kept operational so that the substation can remain functional during the remodeling project. For us, this requires perfect planning and the greatest precision in each of the steps involved. In order to handle the project as efficiently as possible, I and my team will work with three interconnected sections of construction, and we will start the first two as early as August of this year. I am looking forward to the new challenge,\u201d Mairhofer added.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology The next innovation project of EQOS Energie has been given the starting signal&#8230;<\/p>\n","protected":false},"featured_media":13801,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[154],"tags":[],"class_list":{"0":"post-13980","1":"pressemitteilung","2":"type-pressemitteilung","3":"status-publish","4":"has-post-thumbnail","5":"hentry","6":"category-energy-technology","7":"nt-post-class","8":"","9":"masonry-item","10":"col-lg-4","14":"excerpt-none"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EQOS Energie remodels Lieboch substation for Energienetze Steiermark<\/title>\n<meta name=\"description\" content=\"EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation. This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EQOS Energie remodels Lieboch substation for Energienetze Steiermark\" \/>\n<meta property=\"og:description\" content=\"EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation. This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Gruppe\" \/>\n<meta property=\"article:modified_time\" content=\"2022-09-01T10:56:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/07\/presse-uw-lieboch.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/\",\"name\":\"EQOS Energie remodels Lieboch substation for Energienetze Steiermark\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/presse-uw-lieboch.jpg\",\"datePublished\":\"2021-07-22T08:05:00+00:00\",\"dateModified\":\"2022-09-01T10:56:57+00:00\",\"description\":\"EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation. This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/presse-uw-lieboch.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/07\\\/presse-uw-lieboch.jpg\",\"width\":1920,\"height\":768,\"caption\":\"EQOS Press substation Lieboch\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Press releases\",\"item\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/press-release\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EQOS Energie remodels Lieboch substation for Energienetze Steiermark\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/\",\"name\":\"EQOS Gruppe\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/#organization\",\"name\":\"EQOS Gruppe\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/eqos-logo.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-gruppe.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/eqos-logo.svg\",\"caption\":\"EQOS Gruppe\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-gruppe.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EQOS Energie remodels Lieboch substation for Energienetze Steiermark","description":"EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation. This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/","og_locale":"en_US","og_type":"article","og_title":"EQOS Energie remodels Lieboch substation for Energienetze Steiermark","og_description":"EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation. This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology.","og_url":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/","og_site_name":"EQOS Gruppe","article_modified_time":"2022-09-01T10:56:57+00:00","og_image":[{"width":1920,"height":768,"url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/07\/presse-uw-lieboch.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/","url":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/","name":"EQOS Energie remodels Lieboch substation for Energienetze Steiermark","isPartOf":{"@id":"https:\/\/eqos-gruppe.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/#primaryimage"},"image":{"@id":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/07\/presse-uw-lieboch.jpg","datePublished":"2021-07-22T08:05:00+00:00","dateModified":"2022-09-01T10:56:57+00:00","description":"EQOS Energie will construct 110-kV switchgear and revamp the associated 20-kV protection and control technology in real-life operation. This way, EQOS Energie makes a valuable contribution to the secure power supply of the Graz region and continues its growth in energy technology.","breadcrumb":{"@id":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/#primaryimage","url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/07\/presse-uw-lieboch.jpg","contentUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/07\/presse-uw-lieboch.jpg","width":1920,"height":768,"caption":"EQOS Press substation Lieboch"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-gruppe.com\/en\/press-release\/eqos-energie-remodels-lieboch-substation-for-energienetze-steiermark\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eqos-gruppe.com\/en\/"},{"@type":"ListItem","position":2,"name":"Press releases","item":"https:\/\/eqos-gruppe.com\/en\/press-release\/"},{"@type":"ListItem","position":3,"name":"EQOS Energie remodels Lieboch substation for Energienetze Steiermark"}]},{"@type":"WebSite","@id":"https:\/\/eqos-gruppe.com\/en\/#website","url":"https:\/\/eqos-gruppe.com\/en\/","name":"EQOS Gruppe","description":"","publisher":{"@id":"https:\/\/eqos-gruppe.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-gruppe.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/eqos-gruppe.com\/en\/#organization","name":"EQOS Gruppe","url":"https:\/\/eqos-gruppe.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/eqos-gruppe.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/11\/eqos-logo.svg","contentUrl":"https:\/\/eqos-gruppe.com\/wp-content\/uploads\/2021\/11\/eqos-logo.svg","caption":"EQOS Gruppe"},"image":{"@id":"https:\/\/eqos-gruppe.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/pressemitteilung\/13980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/pressemitteilung"}],"about":[{"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/types\/pressemitteilung"}],"version-history":[{"count":0,"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/pressemitteilung\/13980\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/media\/13801"}],"wp:attachment":[{"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/media?parent=13980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/categories?post=13980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eqos-gruppe.com\/en\/wp-json\/wp\/v2\/tags?post=13980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}